hospital atmospheric steam boiler supplier
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
5.11 (1) Every high pressure boiler and every low pressure steam boiler in use at a work place shall be inspected (a) externally, at least once each year; and (b) internally, at least once every two years. (2) Every low pressure hot water boiler and every unfired boiler in use at a …Get Price
5.9.3(m) Boiler Repairs - An employee working on repairs to smoke-boxes, fire-boxes, furnaces or flues of boilers, is entitled to an amount as set in Item 11 (i) of 5.9.3(s). An employee engaged on repairs to oil fired boilers, including the castings, uptakes and funnels, or flues and smoke stacks is entitled to an amount as set in Item 11 (ii Get Price
Steam and hot water boilers shall be equipped, respectively, with listed or approved steam safety or pressure-relief valves of discharge capacity and shall comply with ASME requirements. A shutoff valve shall not be placed between the relief valve and the boiler or on discharge pipes between such valves and the atmosphere. [NFPA 54:10.3.6]Get Price
Steam and hot water boilers shall be equipped, respectively, with listed or approved steam safety or pressure-relief valves of appropriate discharge capacity and conforming with ASME requirements. A shutoff valve shall not be placed between the relief valve and the boiler or on discharge pipes between such valves and the atmosphere. [NFPA 54:10 Get Price
5.11 (1) Every high pressure boiler and every low pressure steam boiler in use at a work place shall be inspected (a) externally, at least once each year; and (b) internally, at least once every two years. (2) Every low pressure hot water boiler and every unfired boiler in use at a …Get Price
Steam and hot water boilers shall be equipped, respectively, with listed or approved steam safety or pressure-relief valves of appropriate discharge capacity and conforming with ASME requirements. A shutoff valve shall not be placed between the relief valve and the boiler or on discharge pipes between such valves and the atmosphere. [NFPA 54:10 Get Price
The #5 Boiler developed an internal water leak sufficient to compromise good boiler water level contro. #5 Boiler fuel (waste heat from coker) was then diverted directly to the stack, and #5 Boiler was shutdown. When this occurs coke fines go out the stack. Coke fines continued to go out of the stack from 2200 6/8 to 0600 hours 6/10.Get Price
Steam and hot water boilers shall be equipped, respectively, with listed or approved steam safety or pressure-relief valves of discharge capacity and shall comply with ASME requirements. A shutoff valve shall not be placed between the relief valve and the boiler or on discharge pipes between such valves and the atmosphere. [NFPA 54:10.3.6]Get Price
The #5 Boiler developed an internal water leak sufficient to compromise good boiler water level contro. #5 Boiler fuel (waste heat from coker) was then diverted directly to the stack, and #5 Boiler was shutdown. When this occurs coke fines go out the stack. Coke fines continued to go out of the stack from 2200 6/8 to 0600 hours 6/10.Get Price
(a) vessels having an internal operating pressure not exceeding atmospheric pressure be 1 Kg./cm. or 15 Ibs. sq. inches absolute; (b) steam boilers, steam reed pipes and their fittings coming under the purview of Indian Boilers Act, 1923 (V of 1923);Get Price