Steam Boiler 10 000 Kgs Hour Capacity

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :Steam Boiler 10 000 Kgs Hour Capacity
  • Supply Capacity : 10 units/month :Steam Boiler 10 000 Kgs Hour Capacity
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

boilermanufactory

Get display discount

boiler
Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • PIPE ALBORBOR RAINBOW BOOK (CP) | PDF | Heat | Heat Transfer

    A. 512 000 psf B. 324 500 psf C A A water tube boiler has a capacity of 1000 kg/hr of steam. One boiler is producing 1591 kg of steam per hour at 1.2 factor of evaporation and an efficiency of 65% and another boiler produced 1364 kg of steam per hour and 1.15 factor of evaporation and an efficiency of 60%.Get Price

  • PIPE ALBORBOR RAINBOW BOOK (CP) | PDF | Heat | Heat Transfer

    A. 512 000 psf B. 324 500 psf C A A water tube boiler has a capacity of 1000 kg/hr of steam. One boiler is producing 1591 kg of steam per hour at 1.2 factor of evaporation and an efficiency of 65% and another boiler produced 1364 kg of steam per hour and 1.15 factor of evaporation and an efficiency of 60%.Get Price

  • Compre Special Project (PPE &IPE) | PDF | Boiler | Thermal

    Capacity of each fan at 110% of the maximum requirement: Q1 = Q2 = 207,830.05(1.10) 2 = 114,306.53 m3/hr = 31.75 m3/s Thus; (a) Q = 31.75 m3/s 36. Supplementary Problem Find the motor size needed provide the forced-draft service to a …Get Price

  • Compre Special Project (ppe &ipe) [vnd5gjm03rlx]

    ME Board Problem Local coal with higher heating value of 5,500 kCal/kg is burned in a pulverized coal fired boiler with 25% excess air at the rate of 25.9 M.T. per hour when the steam generated is 220 M.T. per hour. This boiler is served by 2 forced-draft fans of equal capacity delivering the air at 305 mm of water to the furnace.Get Price

  • Publishing webpages for businesses across the globe

    Our team of highly skilled and experienced plumbers cover an extensive range of plumbing and heating services. We specialise in boiler repairs, central heating, gas cooker installation, smart thermostats, general plumbing, water leak detection and more. Our goal is to deliver high standards of workmanship at affordable rates.Get Price

  • Compre Special Project (ppe &ipe) [vnd5gjm03rlx]

    ME Board Problem Local coal with higher heating value of 5,500 kCal/kg is burned in a pulverized coal fired boiler with 25% excess air at the rate of 25.9 M.T. per hour when the steam generated is 220 M.T. per hour. This boiler is served by 2 forced-draft fans of equal capacity delivering the air at 305 mm of water to the furnace.Get Price

  • Compre Special Project (PPE &IPE) | PDF | Boiler | Thermal

    Capacity of each fan at 110% of the maximum requirement: Q1 = Q2 = 207,830.05(1.10) 2 = 114,306.53 m3/hr = 31.75 m3/s Thus; (a) Q = 31.75 m3/s 36. Supplementary Problem Find the motor size needed provide the forced-draft service to a …Get Price

Discount
7X24 Online